Ir al contenido

European  Union
Ayuntamiento de Pamplona :: Iruñeko Udala


Home > Pamplona Riverside Park > The Action Plan > Facts and figures

Facts and figures

Facts and figures

Area affected

  • River Arga: 11 km
  • River Elorz: 2,74 km
  • River Sadar: 3,72 km
  • Total: 17,46 km

Investment ratios

  • Total investment: €17,205,589
  • Length of river: 17.46 km
  • Surface area treated: 798,000 m2
  • €1,002.66/m
  • € 21.56/m2
Expenditure and funding
  Pamplona City Council [20%] European Cohesion Funds [80%] TOTAL
Integral Plan for the ARGA 1.280.990 5.123.961 6.404.951
Integral Plan for Pamplona’s Rivers: Arga (Phase 2), ELORZ & SADAR [2003-2009] 2.160.128 8.640.510 10.800.638
TOTAL [euros] 3.441.118 13.774.471 17.205.589
Action carried out
  ARGA (Phase 1) [1998-2001] ARGA (Phase 2) [2003-2009] ELORZ - SADAR [2003-2009] TOTAL
Treatment of banks [m] 19.780 4.908 4.040 28.728
Surface area treated [m2] 500.000 178.000 120.000 798.000
Pathway prepared [m] 9.115 6.005 1.102 16.222
Tress planted [unit] 6.726 6.408 3.912 17.046
Furniture installed [unit] 601 228 60 889
Pedestrian footbridges [unit] 3 3 1 7
Historical bridges restored [unit] - 2 - 2

© Pamplona City Council. Plaza Consistorial, s/n - Pamplona (Navarra) - 948 420 100 - Contact - Site map - Links - Credits